Longhupao Oilfield · Daqing · 2010

Hot-Water Well Cleaning with a Pump Skid

There were not enough well-cleaning trucks, so an EHIK pump skid took the place of a plunger-pump hot-washing truck. More than 100 wells were cleaned.

EHIK blue pump and motor installed near oilfield equipment for hot-water well cleaning in 2010.
Hot-water well-cleaning installation · Longhupao Oilfield · 2010
Location
Longhupao, Daqing, China
Application
Hot-water well cleaning
Recorded period
October–December 2010
Work completed
More than 100 wells

The operating problem

The Cleaning Backlog Needed a Pumping Solution.

At Longhupao Oilfield, there were not enough well-cleaning trucks, and more than 100 wells were waiting for hot-water cleaning. The delay was affecting production.

An EHIK pitot tube pump skid was used for the hot washing. Instead of waiting for another high-pressure cleaning truck, the site connected the pump package to the hot-water supply and the wells.

Between October and December 2010, more than 100 wells were cleaned.

The pump needed no repairs in two months of operation.

Recorded operating benefits

What the Pump Package Achieved.

Compared with a plunger-pump hot-washing truck.

100+

Wells Cleaned

The pump package kept a large well-cleaning program going when there were not enough special trucks.

30 L

Less Fuel per Well

Each well used 30 liters (approx. 7.9 US gal) less fuel than with a plunger-pump hot-washing truck.

2

Fewer Crew Members

The skid needed two fewer people: one driver and one pump operator.

1

Hot-Washing Truck Replaced

One fewer plunger-pump hot-washing truck was needed.

800,000+

RMB Saved in Total

More than RMB 800,000 (about USD 113,000) was saved.

600+ t

Oil Production Recovered

More than 600 metric tons (approx. 661 US short tons) of lost crude oil production was recovered, worth nearly RMB 2.4 million (about USD 338,000).

Figures from EHIK's 2010 Longhupao project records.

Plan your well-cleaning package

Start with the Wells
and the Available Hot Water.

Plan the pump, water supply and field connections together.

Water Temperature and Supply

Water temperature at the pump inlet, source-tank level, suction pipework and available water volume decide the supply arrangement. Inlet conditions are important when pumping hot water.

Flow and Required Pressure

Cleaning flow, the pressure needed at the wellhead and losses between the pump and the well determine the pump requirements. Cleaning time and the operating sequence also affect the package design.

Connections and Mobility

Plan the hose or pipe connections, power supply and equipment footprint. A skid lets you move the pumping equipment in one piece from site to site.

Controls and What’s Included

Agree what is included in the package: pump, drive, base, pipework, valves, instruments and controls. Agree which items the site will supply before manufacture.

Keep your field operation moving

Let's Plan Your Well-Cleaning Package.

Contact EHIK for a hot-water well-cleaning package. We can help select the pump and plan the mobile skid, field connections and controls. We reply within 1 business day.

Send Your Flow and Head

Tell us the flow, head and liquid. We reply within 1 business day.
Only your name or company and your email are required.
Use the Full Inquiry Form

Pump Selection

Pumping equipment matched to your operating requirements and water conditions.

Curves and Outline Drawings

Review performance and plan the package arrangement.

Technical Support

Help with included equipment, site connections and operation.