Skip to content

Why EHIK

Pitot Tube Pump Manufacturer · Projects Since 2004

Fast supply. Wear-resistant options. A strong pickup-tube connection. EHIK offers pumps and parts in stock, specialist manufacturing and direct technical support.

See what makes EHIK different—and how high-head, low-flow pumping helps your process, from feedstock-oil supply to high-pressure water.

Blue EHIK pump sets with yellow coupling guards and gray motors arranged in a workshop production row.
  • Stock & Fast Supply
  • Wear-Resistant Options
  • Robust Tube Connection
  • Industry-Matched Pumping

The EHIK Advantage / Stock & Delivery

Extensive Stock.
Faster Supply.

EHIK keeps pumps in stock, and some pickup tube sizes are often in stock. This means faster delivery for new projects and quick access to parts for pumps already running.

Contact EHIK about availability for a bare-shaft pump, a complete pump set or a replacement component. We help confirm the right configuration, and the quotation states the delivery time. We reply within 1 business day.

Check Stock & Lead Time
Bare-Shaft Pumps
Starting from1 week
Standard pump sets — motor and base included
Standard lead time4 weeks
Shelves of pump components and spare parts in EHIK’s warehouse.
Inventory for new projects and running equipmentStock in the EHIK warehouse for pump assembly, repairs and replacement parts.
An EHIK pickup tube held beside storage bins containing pump components.
Pickup tubes and service componentsParts in stock help you plan replacements. Contact EHIK to match the part and check stock. We confirm the fit before supply.

The EHIK Advantage / Pickup-Tube Engineering

Longer-Lasting Pickup Tubes.
A Stronger Connection.

Replace the pickup tube less often: it is matched to your liquid and held by a large threaded joint.

Five EHIK pickup tubes for pitot tube pumps.
EHIK pickup tubes

Wear-Resistant Options for Abrasive Liquids

The pickup tube is the main wear part, like the wear ring of a centrifugal pump: when it wears, you replace it. For liquids with hard particles, we offer a coated wear-resistant pickup tube that lasts much longer.

EHIK threaded pickup tube connection at left beside a multi-bolt connection at right.
EHIK threaded connection (left) and a multi-bolt connection (right).

A Large Threaded Joint.
A Firmly Secured Pickup Tube.

On applicable models, a large threaded joint replaces the connection secured by multiple small bolts, reinforcing the pickup tube attachment.

The photo shows EHIK’s threaded connection on the left and a multi-bolt connection on the right, so you can see how each holds the tube.

EHIK’s wear-resistant options and connection design build on the pitot tube pump’s single-stage hydraulic principle. See How the Pumping Principle Benefits Your Process

EHIK mechanical seal assembly with its machined metal flange and sealing face.
EHIK balanced, single-face cartridge mechanical seal.

Seal Design

High Pressure at the Outlet.
Low Pressure at the Seal.

The mechanical seal is located at the low-pressure inlet. It does not have to seal against the pump’s high discharge pressure, so the seal works under less load.

EHIK’s balanced cartridge seal is easy to replace and maintain. The seal is matched to the liquid and operating conditions, including temperature, corrosive substances and solids.

Explore Pump Selection

Customers and Supply Records

Customers include Cabot, Birla Carbon, Orion, Black Cat Carbon Black, PetroChina, Sinopec and Vinda.

667 supply records since 2007, including 422 for carbon black and 109 for pulp and paper.

Documented Replacement

Lower Electricity Use in a Documented Replacement

Multistage Pump Replacement at PetroChina · Shunan Gas Mine

Kong 6 Well, Zigong Operating Area · China · 2015

39.5% less electricity

For the same volume of gas-field water pumped.

EHIK replaced the multistage centrifugal pump at Kong 6 Well in the Zigong Operating Area of PetroChina's Shunan Gas Mine. The motor was reduced from 90 kW to 45 kW (approx. 121 hp to 60 hp). Meter readings on site showed 39.5% less electricity for the same volume of gas-field water. The pump runs steadily and needs fewer repairs.

Estimated yearly saving: about 309,600 kWh.

About USD 20,000 a year saved on maintenance (project records).

Multistage centrifugal pump at Kong 6 Well before the 2015 retrofit.
Before: Multistage centrifugal pump
EHIK pitot tube pump and associated piping at Kong 6 Well after the 2015 retrofit.
After: EHIK pitot tube pump

Read the Kong 6 Replacement Case

Replacement Experience

A Practical Alternative to a Troublesome Pump

EHIK pumps have replaced multistage centrifugal pumps and plunger pumps, with fewer repairs caused by wear. When we replace a multistage pump, we also help cut power use while keeping the required flow and pressure. Custom flanges match your existing piping, so the new pump connects directly.

Multistage Centrifugal Pumps
A single-stage alternative for high pressure at low flow, with less wear, maintenance and running cost in mind.
Plunger Pumps
Consider smooth rotary pumping with no pulsation if frequent parts changes caused by wear are disrupting your process.
Roto-Jet Pumps
Replace a Roto-Jet pump with an EHIK pitot tube pump. The pickup tube is the main replaceable part, with selection support and wear-resistant options.
Discuss a Replacement
EHIK pump set installed during a multistage pump replacement project.

Engineering & Manufacturing

Precision in the Components That Matter.

From the key pump parts to the finished package, EHIK designs, machines, balances and tests in its own facilities.

EHIK team assembling pump sets in the workshop.
EHIK pump-set assembly in the workshop.

A specialist manufacturer, not just a pump supplier.

We design and manufacture pitot tube pumps, assemble pump sets and integrate complete skids. The pump, materials, seal and drive are chosen for your liquid and operating conditions.

Precision-machined components
Pump parts, including forged rotors, are made on CNC machines.
Dynamic balancing
Forged rotors are precision machined and dynamically balanced for stable operation.
Pump testing
Before shipment, every pump is performance-tested on EHIK’s test bench—pressure, flow, vibration and other required checks—and a test report is issued. Testing can also follow your own requirements.
You can also witness the test of your own pump.
Factory & offices
EHIK’s factory is in Gu’an, Hebei Province, China. Our offices and R&D centers are in Beijing and Chengdu.
The factory is about 20 km (approx. 12.4 mi) from Beijing Daxing International Airport. You are welcome to visit, meet our engineers, inspect your pump and watch its test.
Patents
Since 2014, EHIK and its predecessor companies have been granted 22 Chinese utility-model and design patents for pump, pickup-tube, seal, rotor-cover and pump-skid designs.
Recognitions
High-tech Enterprise, Beijing Innovative Small and Medium-sized Enterprise and AAA enterprise credit rating. EHIK® is a registered trademark in China.
View Our Management-System Certificates
EHIK technician beside a pump set connected to the test-bench pipework, flow meters and control panels.
Performance testing on the EHIK test bench.
Hand-held vibration meter held against a pump bearing housing during testing.
Vibration measurement during pump testing.
EHIK staff in the assembly workshop, standing behind a pallet of pump parts.
The people who machine, assemble and test EHIK pumps, in the Gu’an workshop.

Documented Management Systems

Three ISO-Certified
Management Systems.

EHIK holds quality, environmental, and occupational health and safety management certificates. They cover pump design, inspection, assembly, testing, sales and maintenance services, plus the design and sale of specified pump components.

Certificates valid from 2 April 2026 to 1 April 2029.

Supply Options

From a Bare-Shaft Pump to a Complete Pump Skid

Choose the supply package for your project. EHIK helps match the pump, materials, seal and drive to your liquid and operating conditions.

Need a Component? Explore Pickup Tubes ↗

Bare-Shaft Pumps

Pumps without a motor or common baseplate, for replacements and for equipment builders.

Direct Technical Support

From Pump Selection to Ongoing Support.

Work directly with a team that has delivered pitot tube pump projects since 2004. We help with selection, drawings, parts and installation, for a new process or for improving an existing one.

Pump Selection & Drawings
We match the pump to the operating requirements and provide performance curves and outline drawings for your planning.
Spare Parts
We help match replacement parts and check stock before supply.
Repairs
Show us the worn or damaged parts, and we plan the parts and repairs needed.
On-Site Commissioning
Technical support for installation checks and start-up. The pump has a simple design: in most cases, your own engineers can install it by following the manual. On-site service is available on request.
Remote Support
Help with operating problems and troubleshooting by email, WhatsApp or video call.
Retrofits
We review the operating requirements, connections and space to plan a replacement or upgrade. Custom flanges can match your existing piping.

Talk to EHIK

Let's Discuss Your Pumping Project.

Contact EHIK for pump selection, replacement parts or an integrated package. If you know the liquid properties, flow or pressure, please include them—but you do not need a complete specification to start. We reply within 1 business day.

For an existing pump, EHIK can help find the cause of operating problems and check how a replacement would perform and fit.

info@ehikpumps.com
Email EHIK

What You Can Get from EHIK

  • Pump selection for your operating conditions
  • Performance curves
  • Outline drawings
  • Included equipment and quotation
  • Technical support for installation and operation

Send Your Flow and Head

Tell us the flow, head and liquid. We reply within 1 business day.
Only your name or company and your email are required.
Use the Full Inquiry Form