Skip to content
EHIKPUMPS
Menu

Pitot Tube Pump Specialists · Since 2004

Why Choose EHIK Pitot Tube Pumps?

Fewer parts changes. Lower running costs. Pumps and skids from one supplier. EHIK combines focused pitot tube pump engineering with replacement experience and direct technical support.

EHIK pump sets arranged in rows at the factory.
  • Wear-Resistant Options
  • Pump Replacement Experience
  • Pumps & Complete Skids
  • Fast Response & Short Lead Times

02 / Engineering for Service

Less Wear. Fewer Parts Changes.

We continuously improve wear protection and pickup tube connections to help keep demanding processes running.

Five EHIK pickup tubes for pitot tube pumps.
EHIK pickup tubes

Wear-Resistant Options for Abrasive Liquids

In extremely abrasive conditions with high concentrations of hard particles, EHIK offers more wear-resistant solutions that can extend pickup tube replacement intervals from 1–3 weeks for standard tubes to 2–3 months. We continuously improve wear protection and connection design.

EHIK threaded pickup tube connection at left beside a multi-bolt connection at right.
EHIK threaded connection (left) and a multi-bolt connection (right).

A Robust Pickup Tube Connection

EHIK's large-diameter threaded connection provides secure support for the pickup tube. We continuously improve the connection design for demanding service.

A rotating chamber and stationary pickup tube deliver smooth, low-pulsation flow with a simple single-stage hydraulic layout. Explore the Pump Design & Performance

03 / Replacement Experience

A Practical Alternative to a Troublesome Pump

EHIK has replaced multistage centrifugal and plunger pumps to reduce wear-related repairs. For multistage pump replacements, we also help lower power consumption while meeting the required flow and pressure.

Multistage Centrifugal Pumps
Explore a single-stage alternative for high-pressure, low-flow duties, with attention to wear, maintenance and running costs.
Plunger Pumps
Consider smooth, low-pulsation rotary pumping when frequent wear-related parts changes are disrupting your process.
Roto-Jet Pumps
Discuss an alternative pitot tube pump supplier, with EHIK selection support, wear-resistant options and replacement planning.
Discuss Your Existing Pump
EHIK pump set installed during a multistage pump replacement project.

04 / Documented Replacement

Lower Electricity Use in a Documented Replacement

Multistage Pump Replacement at PetroChina · Shunan Gas Mine

Kong 6 Well, Zigong Operating Area · China · 2015

39.5% less electricity

For the same volume of gas-field water pumped.

EHIK replaced the multistage centrifugal pump at Kong 6 Well in the Zigong Operating Area of PetroChina's Shunan Gas Mine. The motor rating was reduced from 95 kW to 45 kW (approximately 127 hp to 60 hp). Site meter readings showed 39.5% lower electricity use for the same volume of gas-field water pumped, with stable operation and fewer repairs.

Illustrative annual electricity savings: approximately 343,700 kWh.

Multistage centrifugal pump at Kong 6 Well before the 2015 retrofit.
Before: Multistage centrifugal pump
EHIK pitot tube pump and associated piping at Kong 6 Well after the 2015 retrofit.
After: EHIK pitot tube pump

05 / Supply Options

From a Pump Head to a Complete Pump Skid

Choose the supply package for your project. EHIK helps match the pump, materials, seal and drive to your liquid and operating requirements.

Pump Heads

Pump assemblies supplied without a motor or common baseplate, for replacement projects and equipment integration.

EHIK pitot tube pump set with motor, coupling guard and baseplate.

Complete Pump Sets

A pitot tube pump supplied with a motor, coupling, guard and baseplate for a complete pump-and-drive package.

Explore Pitot Tube Pumps

06 / Availability

Fast Response. Short Lead Times.

Pumps in stock and direct technical support help keep your project moving.

Tell us your required duty and target delivery date. We will confirm availability and the supply package in your quotation.

Ask About Availability & Lead Time
Pump heads
From 1 week
Standard pump sets — motor and base included
4 weeks

07 / Focus & Service

Focused on Pitot Tube Pumps. Ready to Support Your Project.

Pitot tube technology is our focus. Since 2004, we have developed solutions for high-pressure, low-flow applications. We design and manufacture pumps, assemble pump sets and integrate complete skids.

EHIK team assembling pump sets in the workshop.
Pump Selection
Match the pump configuration to your liquid, flow, pressure and operating conditions.
Spare Parts
Plan the parts needed to keep your pump in service.
Repairs
Get support with wear, damaged components and pump repair.
On-Site Commissioning
Work with EHIK on installation checks and start-up.
Remote Support
Discuss operating issues and troubleshooting with our team.
Retrofits
Review an existing pump installation and plan its replacement or upgrade.

08 / Talk to EHIK

Let's Improve Your Pumping Operation

Send your operating conditions, liquid properties, required flow and pressure. Tell us about frequent repairs, parts wear, energy use or the new system you are planning. EHIK will help you choose a pump configuration and prepare a quotation.

Replacing a pump? Add its model, nameplate photo and installation photos.

info@ehikpumps.com
Email EHIK

Get Selection Help & a Quote

  • Operating conditions
  • Liquid properties
  • Required flow
  • Required pressure
Prepare Your Inquiry