Less work at the site
No dedicated concrete foundation or anchor bolts. Position the skid, connect the pipework and power, and start pumping.
Integrated pumping solutions
Maintenance-free, unattended pumping. EHIK brings the pump, pipework and automatic controls together in a ready-to-connect package for water transfer, reinjection and well cleaning.
Discuss a Pump Skid ↗
No dedicated concrete foundation or anchor bolts. Position the skid, connect the pipework and power, and start pumping.
Maintenance-free packages with automatic level-based control for unattended operation in remote locations.
When field needs change, move the whole package. The pump and its supporting equipment stay together.
The 3D layout shows how pumps, vessels, pipework, valves and controls fit together on one skid.

The pumping unit at the heart of the package.
Process vessels integrated into the skid layout.
Connected flow paths and operating valves.
Package controls arranged alongside the equipment.
One structure carrying the assembled equipment.
See what is inside a pump skid, part by part, in the EHIK Pitot Tube Pump Handbook.
The integrated package
The pump and supporting equipment are put together before they reach the site. You agree on the included equipment and one set of connection points with one supplier.
EHIK skids are used for high-head, low-flow pumping in gas-field water transfer, reinjection and hot-water well cleaning.
For gas-field water, we also consider H₂S and CO₂, chlorides, scale-forming salts, solids and operating temperature—not only flow and pressure.
The pitot tube pump, motor, coupling and guard selected for your flow, pressure and available power supply.
Skid pipework, operating valves and connections arranged for your liquid and process.
Instrumentation, control panels, variable-speed control and operating signals for automatic operation.
A common skid base with vessels, seal-support equipment or an enclosure to suit the process and site.
A pump set combines a pump and drive. A pump skid brings the supporting process equipment and controls together around them.

EHIK designs and manufactures the pitot tube pump at the heart of the skid. Wear-resistant pickup tubes and a large threaded pickup-tube joint suit demanding liquids.
Explore Pump Components ↗Control & process integration
Keep pumping without an operator on site. The package includes both the controls and the equipment.

If you transfer liquid in short batches, the peak flow can be high. Pumping the same volume over more hours can lower the peak flow and the back pressure in the pipeline.
Gas–liquid packages
Gas and liquid separate in vessels. The liquid passes through the pump while the gas follows a separate path. The two streams join again at the discharge, so less gas needs to be vented.
Gas–liquid package process flow. We select the equipment for your gas content, liquid properties and operating pressure.
Field projects & repeat orders
A desert installation followed by a repeat order. Gas-field water systems in operation. A practical answer to a shortage of well-cleaning trucks.
Featured project · Tarim Oilfield

PetroChina ordered one EHIK pump skid in 2022 for a desert project in the Hotan area of Tarim Oilfield, Xinjiang.
After three years of successful operation, PetroChina ordered two more unattended pump skids in 2025. The enclosed package holds the pumping equipment and supporting systems for a remote oilfield site.
Xinjiang project · workshop photographs · click to enlarge



Different applications. Real installations.
These projects show how the package works in real operations—not just what the equipment looks like.

Shunan Gas Field · 2024
EHIK pumps are integrated with field pipework, valves and instrumentation for gas-field water transfer. Here you can see how the pumps connect to the rest of the process system.
In the photo: pumps and drives, connected pipework and easy-to-reach valves at a working gas field.

Longhupao Oilfield, Daqing · 2010
There were not enough well-cleaning trucks, and more than 100 wells were waiting for hot washing. An EHIK pump skid did the work instead, cleaning more than 100 wells between October and December 2010.
Compared with a plunger-pump hot-washing truck, the 2010 project records show 30 liters (approx. 7.9 US gal) less fuel per well and two fewer crew members—a driver and a pump operator.




Installation & engineering support
No dedicated concrete foundation or anchor bolts. Position the complete package, connect the process pipework and power supply, and start operation.

Designed for relocation & reuse
Move the pump and supporting equipment together as site needs change. Reuse the integrated package at another installation.
Inlet and outlet positions, pipe sizes, suction conditions and the equipment that will remain on site.
Available power supply, motor and drive requirements, automatic controls and plant signal connections.
Skid dimensions, open-frame or enclosed construction, lifting access and connections for future relocation.
Direct access to the pump, pipework and instruments within an existing plant.
See the Open-Frame Package ↑Equipment inside a housing that can be transported, with insulation, ventilation and temperature control chosen for the site.
See the Enclosed Equipment ↑Start a conversation. EHIK will help define the package for your application. We reply within 1 business day.
We also offer on-site commissioning, remote support, spare parts and repairs.
Discuss a Pump Skid ↗Planning your package

No. The complete skid does not need a dedicated concrete foundation or anchor bolts. Put the package in place and connect the process pipework and power supply.
Yes. EHIK offers maintenance-free, unattended packages for remote pumping applications, with automatic control for the process.
EHIK builds the skid around your operating requirements, existing pipe connections, power supply and control needs. Connections can be made to match your existing piping, so the package is ready to connect when it arrives. We confirm the details for each site.
Yes. Open-frame packages keep equipment readily accessible. Enclosed packages bring the equipment and supporting systems inside one enclosure, as shown in the Tarim project. The arrangement follows the installation environment and access requirements.
The liquid, temperature, gas, solids and corrosion conditions decide the choice of wetted parts, valves, seals and supporting systems. Pump material options include carbon steel, 304 and 316 stainless steel, duplex stainless steel and other materials for the service.
Lead time depends on the pump, the supporting equipment and how much integration is needed. EHIK confirms the delivery schedule in the proposal.
No. Contact EHIK to discuss your project. If you know the liquid properties, flow and pressure, please include them. We help define the operating requirements and provide selection, performance curves, outline drawings and technical support. Once we have your operating data, we send a quotation and technical proposal for the skid within 5 business days.
Engineering support
Contact EHIK for help with your pumping project. We provide pump selection, performance curves, outline drawings and technical support. We reply within 1 business day.