EHIKPUMPS
Menu

Oil & Gas Applications

Pitot Tube Pumps & Skids for Oil & Gas

High-head, low-flow pumping for produced water, contaminated oil and field services. EHIK builds the pump or integrated skid for your liquid, operating conditions and site.

Water transfer & reinjectionRemote operationsWell cleaning
Two EHIK pumps on a common installation platform with connected field piping, valves and instruments.
EHIK pumping equipment integrated with field pipework, valves and instruments.

Start With the Duty

Different Liquids.
Different Field Requirements.

Your liquid, the flow and pressure you need, and your site decide what goes into the pumping package.

Produced Water

Transfer & Reinjection

Pump gas-field and oilfield water at the flow and pressure the receiving system needs. Gas, sand, salts and corrosive substances decide the materials, wear protection and inlet arrangement.

EHIK supplies single pump sets and integrated packages that connect to your water-handling system.

Contaminated Oil

Transfer Difficult Liquids

Sediment, polymers and changing liquid properties can make oil transfer difficult. The pump is matched to the liquid composition, temperature, inlet conditions and how it runs.

The Daqing Oilfield project below shows an EHIK pump on contaminated oil. Our project records show stable operation.

Remote Installations

Operate Without a Local Crew

Maintenance-free, unattended packages include the equipment and automatic controls a remote site needs. Choose an open-frame or enclosed layout to arrange and protect the equipment.

The Hotan desert project uses an enclosed package. After three years of successful operation, the customer ordered again.

Field Services

Hot-Water Well Cleaning

A dedicated pump skid gives the flow and pressure for well cleaning. We define the water temperature, cleaning work and site connections as part of the package.

At Longhupao Oilfield, when there were not enough well-cleaning trucks, our project records show hot-water cleaning of more than 100 wells.

Featured Project / Tarim Oilfield

One Skid in 2022.
Two More Ordered in 2025.

An enclosed pumping package for PetroChina's desert project in the Hotan area of Xinjiang.

Original enclosed EHIK pump skid in the Hotan desert in 2022 with a vessel and field pipework.
Original installation — Hotan, Xinjiang, 2022.

PetroChina ordered one EHIK pump skid in 2022 for a desert project in the Hotan area of Tarim Oilfield.

After three years of successful operation, PetroChina ordered two more unattended pump skids in 2025.

The enclosed package holds the pumping equipment and supporting systems for a remote site. It shows how the pump and its operating environment can be planned as one package.

Read the Tarim Project Story
2022One skid ordered for the Hotan project
3 yearsSuccessful operation before the repeat order
2025Two more unattended skids ordered
Open enclosure of the Xinjiang project equipment showing internal pipework, valves, instruments and control panels.
Xinjiang project equipment — workshop view of the pipework, instruments and controls.

Inside the Equipment

Pipework, Controls & Equipment Access.

The open enclosure shows the valves, instruments, control panels and connected pipework. Because these are assembled before delivery, there is less work to do on site.

For your project, we define the process connections, power supply, control signals and access together with the pumping duty.

Explore the Pump Skid Package

Gas-Field Water / Real Installations

Gas-Field Water Pumps in Service.

These three installations show EHIK pumps connected with vessels, operating valves, instruments and the site's water-handling pipework.

Different Problems / Different Duties

From Contaminated Oil
to Well-Cleaning Water.

Our project records include both permanent liquid-transfer installations and equipment for field-service work.

EHIK pump and connected pipework at the Daqing contaminated-oil transfer installation.
Contaminated-oil transfer installation at Daqing Oilfield.

Contaminated Oil at Daqing

Oil with sediment and polymers made the old transfer equipment hard to run. An EHIK pump was installed for this transfer. Our project records show stable operation after installation.

For a similar liquid, start with its composition, solids and viscosity, then review wear-resistant options, materials and the inlet arrangement.

Blue EHIK pump beside an oil well used for hot-water well cleaning at Longhupao in 2010.
Hot-water well-cleaning installation at Longhupao Oilfield, 2010.

Well Cleaning at Longhupao

When there were not enough well-cleaning trucks at Longhupao Oilfield in Daqing, a pump skid did the work instead. Our project records show more than 100 wells cleaned between October and December 2010.

Compared with the usual hot-washing method, the project records show 30 litres less fuel per well and two fewer workers—a driver and a pump operator.

Recorded duty: 5–20 m³/h · 3–5 MPa · 37 kW.

Read the Well-Cleaning Case

Planning a New Installation

Define the Duty.
Then Define the Package.

Pump selection and site layout should be discussed together. EHIK can supply a complete pump set or a skid with the supporting equipment your project needs.

Liquid & Operating Envelope

Flow, pressure, liquid temperature and inlet conditions define the duty. H₂S, CO₂, chlorides, salts, sand and gas content influence materials, wear protection and the inlet arrangement.

Control & Continuous Delivery

Tank-level signals, automatic start/stop and the production range decide the control setup. Variable-speed control adjusts the pumping rate to changing demand.

Equipment & Site Connections

Choose an open-frame or enclosed arrangement. Agree the power supply, control signals, piping interfaces, instrumentation and equipment access before manufacture.

Less Site Construction

EHIK skid packages need no dedicated concrete foundation or anchor-bolt fixing. Position the skid, connect the specified pipework and power, and start pumping.

Unattended Operation

Maintenance-free packages and automatic level-based controls let remote sites run without an operator.

Move, Reconnect, Reuse

The integrated package can be relocated as a unit and reused as site requirements change.

Existing-Equipment Upgrade / Kong 6 Well

39.5% Less Electricity
for the Same Water Volume.

In 2015, EHIK replaced the multistage pump at Kong 6 Well in PetroChina's Shunan Gas Mine. Our project records show stable operation and fewer repairs after the replacement.

Multistage centrifugal pump at Kong 6 Well before its replacement in 2015.
Before: Multistage Centrifugal PumpThe original Kong 6 installation, with a 95 kW motor.
EHIK pitot tube pump and connected field pipework at Kong 6 Well after the 2015 replacement.
After: EHIK Pitot Tube PumpThe 2015 replacement installation, with a 45 kW motor.

Meter readings on site showed 39.5% less electricity per 10,000 m³ of gas-field water at Kong 6.

See the Comparison and Project Details

Oil & Gas Pump FAQs

Move From a Field Duty
to a Clear Specification.

Contact EHIK about your field application. If you know the liquid properties, flow or pressure, please include them. We work out the equipment scope from there.

Should I specify a pump set or a complete skid?

A pump set brings together the pump and drive on a baseplate. A skid can also include vessels, pipework, valves, instruments and controls. EHIK helps define the supply scope and how the equipment connects to the site.

What if produced water contains gas, sand or corrosive components?

Liquid composition, temperature, gas content, and particle size and concentration affect the configuration. EHIK chooses materials, wear-resistant options, seal support and the inlet arrangement for these conditions. Gas–liquid separation can be part of the package if needed.

Can the package operate unattended at a remote site?

Yes. EHIK supplies maintenance-free, unattended packages with automatic level-based control. The package is designed around your signals, operating sequence, power supply and site environment. The Tarim reference includes two more unattended skids ordered in 2025.

Does a skid need a dedicated foundation?

No. EHIK's integrated skids need no dedicated concrete foundation or anchor bolts. Agree the location and site connections, put the package in place, and connect the pipework and power.

Can the system handle gas and liquid together?

The gas–liquid package separates gas and liquid in the vessel and joins them again after the pump. The pump handles only the liquid while the system manages the gas, which helps reduce emissions. EHIK reviews the gas and liquid conditions when configuring this arrangement.

Will a replacement deliver the same saving as Kong 6?

Not necessarily. The 39.5% figure is from that project. A fair comparison uses measured power, volume pumped, running hours and maintenance at the same duty. Contact EHIK to assess a replacement for your site.

Can we begin before the site drawings are complete?

Yes. Contact EHIK at any stage. Include any liquid properties, flow or pressure you know—you do not need a complete specification. We reply within 1 business day. EHIK can provide pump selection, performance curves, outline drawings and technical support.

Move Your New Project Forward

Turn the Field Duty
into an Equipment Proposal.

Contact EHIK for produced-water transfer, reinjection or field-service pumping. We can help select a pump set or an integrated package for your field operation. We reply within 1 business day.

Contact EHIK

Replacing a pump? We review the duty and site connections, and custom flanges can match your existing piping.

Pump Selection & Performance Curves

Check the proposed pump against the flow, pressure and liquid you need.

Outline Drawings

Plan the equipment footprint and connections for your site layout.

Equipment Scope & Technical Support

Agree the equipment scope and get answers on operation, controls and installation from the manufacturer.