Reduce Site Assembly
The pump, pipework, valves and controls are assembled before delivery, so the site team only needs to make the outside connections.
The project
At a desert project in the Hotan area of Tarim Oilfield, PetroChina needed pumping equipment for a remote installation. EHIK supplied an enclosed skid with the pumping equipment and supporting systems in one package.
The first skid was ordered in 2022. After three years of successful operation, PetroChina ordered two more unattended pump skids in 2025. That repeat order is the clearest outcome of this project: the customer chose to use EHIK equipment again.
A closer look
Inside are the pumping equipment, pipework, valves, instruments and controls, all in one package. The workshop photos show what the desert photo cannot.



What this means for your project
A skid's value is how the equipment works together on site. Define the process and connections early, then build the package around them.
The pump, pipework, valves and controls are assembled before delivery, so the site team only needs to make the outside connections.
Automatic level-based control and the operating signals can be built into the package, for a site without a permanent operator.
Plan the enclosure doors, operating points and equipment layout for the space at your site.
Your next field installation
Contact EHIK to discuss a remote field installation. We can help develop an integrated skid with the pumping equipment, controls and enclosure your project needs. We reply within 1 business day.
Contact EHIKThe proposed pump and operating point for your liquid.
Plan the package footprint, connections and supporting equipment.
Help with site and control requirements.