EHIKPUMPS
Menu

PetroChina · Shunan Gas Mine · 2015

Less Electricity.
The Same Volume Pumped.

At Kong 6 Well, replacing a multistage pump with an EHIK pump reduced metered electricity use by 39.5% for the same volume of gas-field water.

EHIK pitot tube pump and motor at Kong 6 Well after the multistage pump replacement.
EHIK pump after the replacement · Kong 6 Well · 2015
Site
Kong 6 Well
Operating area
Zigong, Shunan Gas Mine
Liquid duty
Gas-field water
Project
Multistage pump replacement, 2015

Recorded outcome

39.5%

Less Electricity for the Same Water Volume.

In 2015, EHIK replaced the old multistage centrifugal pump at Kong 6 Well in PetroChina's Zigong Operating Area. Our project records show stable operation and fewer repairs after the change.

The energy result comes from meter readings on site during normal operation. It compares electricity use for the same volume of gas-field water—not just the two motor ratings.

Source: EHIK's historical project record, published in 2016. This result is for Kong 6 Well only; savings at other sites may be different.

At the installation

Before and After the Replacement.

Both photos are from the Kong 6 project. They show the old multistage pump and the new EHIK pump.

Original multistage centrifugal pump at Kong 6 Well before replacement.
Before · Multistage pumpThe existing equipment at the gas-field water installation.
EHIK replacement pump and connected site piping at Kong 6 Well.
After · EHIK pumpThe replacement equipment connected to the field pipework.

A useful comparison for your site

Compare the Operating Duty,
Not Just the Nameplate.

A good replacement starts with what the system really needs and how much power the old pump uses.

Establish the Water Duty

Flow, pressure, water composition, temperature and inlet conditions define the water duty. Gas, particles and changes in operation also affect the choice.

Define a Fair Energy Baseline

Measure electricity use and pumped volume over a typical period. A fair comparison keeps changes in running hours or volume separate from changes in pump performance.

Coordinate the Replacement

EHIK reviews the duty and connections with you, then proposes a pump that fits your system. Custom flanges can match your existing piping.

Explore EHIK Pump Configuration and Replacement Options ↗

For your installation

Find Out What a Replacement Could Change.

Contact EHIK to discuss an existing-pump replacement. We help assess the duty, the fit and a fair performance comparison for your site. We reply within 1 business day.

Contact EHIK

Planning new equipment? Contact EHIK

Selection & Performance Curves

A proposed pump matched to the required liquid duty.

Outline Drawings

Equipment dimensions for checking the layout and connections.

Technical Support

Help with operating conditions, the proposed pump and supply scope.